Hebei Fireproof Coating: What issues should be noted during the application of fireproof coatings?


Release date:

2022-07-14

Author:

Zhengxiang Fireproof Materials

Hebei Fireproof Coating: Fireproof coating is a passive flame-retardant material applied to the surface of the object being protected. Every protected object has a limit—its capacity to withstand fire exposure. Regardless of its structural form, any building exposed to fire for an extended period will eventually collapse. The function of fireproof coating is to insulate the surface of the protected object, delaying the onset of structural failure and buying valuable time for rescue and firefighting efforts.

  Hebei Fireproof Coating: Fireproof coating is a passive flame-retardant material applied to the surface of the object being protected. Every protected object has a limit to the fire exposure it can withstand; regardless of its structural composition, any building will collapse if exposed to fire for an extended period. The function of fireproof coating is to insulate the surface of the protected object, delay the onset of structural collapse, and buy valuable time for rescue and firefighting operations. The following are... Hebei fireproof coating Points to note during construction:

  

 Hebei fireproof coating


  I. Application Methods for Fire-Retardant Coatings in Hebei Province

  1. Scraper application method: Use metal or non-metallic scrapers, such as hard rubber sheets, fiberglass scrapers, or horn-shaped scrapers, to manually apply various thick-paste fireproof coatings and putties.

  2. Roller coating: To apply, first dip the roller into the coating, then roll it over the desired surface. Develop roller-coating equipment powered by an air compressor to convey the coating.

  3. Brush application: This method is suitable for objects of any shape, and most fire-retardant coatings can be applied this way. Brushing readily penetrates the fine pores on metal surfaces, thereby enhancing adhesion. Its drawbacks are low productivity and high labor intensity. Additionally, brush marks may sometimes remain on the coating surface, affecting its aesthetic appearance.

  4. Spraying method: Compressed air and a spray gun are used to atomize the coating, resulting in uniform coating quality and high production efficiency. The drawbacks are that a portion of the coating is lost due to extensive solvent evaporation, and operator health may be compromised.

  II. Construction Environment for Fire-Retardant Coatings in Hebei Province

  1. After mixing, the slurry should be allowed to stand for 15–25 minutes before construction to ensure it reaches optimal workability viscosity.

  2. Determine the amount of paint to be mixed based on your application capacity; mix only as needed. Use the prepared paint within 120 minutes; do not reuse paint that has thickened or set. Hebei fireproof coating

  3. It is recommended to use the spray application method for initial construction. The coating thickness should not exceed 5 mm; a second coat may be applied by spraying or troweling. Each subsequent coat should not exceed 10 mm in thickness, with a 24-hour interval between applications, until the design thickness of at least 13.3 mm is achieved.

  4. The ambient temperature at the construction site shall be between 5 and 38°C, with relative humidity not exceeding 85%. The curing period for physicochemical property testing is 28 days, and for fire resistance testing it is 40 days.

  5. If the coating is applied outdoors, once it has substantially dried, the surface of the fire-resistant coating must be protected with an acid- and alkali-resistant modified acrylic coating.

  6. Undried coatings must not be subjected to impact, washed with water, or exposed to rain.

  III. Construction Requirements for Fire-Retardant Coatings in Hebei Province

  1. Fireproofing spray protection for steel structures shall be carried out by a professionally trained and qualified construction team, and safety technical and labor protection requirements during the construction process shall comply with current relevant national regulations.

  2. Fireproof coating application may proceed only after the steel structure has been installed and positioned, and after the associated components—such as suspension rods, catwalks, and pipe supports—have been installed and passed inspection.

  3. Prior to construction, the steel structure surface shall be derusted, and rust-prevention treatment shall be determined according to service requirements.

  4. Debris on the steel structure surface shall be thoroughly removed, and joints must be filled and sealed with fireproof coating or other fire-resistant materials before construction can proceed.


Tag

Leave a message online

Fill out the form with your details, and our team will assist you in finding the best solution.

Submit Now

Contact Us


WhatsApp:

+8613091100291

Address:

Northwest corner of the intersection of Fengya Avenue and Shaoze Road, Xinxing Industrial Park, Jize County, Handan City, Hebei Province